Three floors of IT equipment, fully decommissioned in one week.

BGIS contracted Unio Tech Solutions to decommission three floors of IT equipment at a Bell Canada site — disconnected, staged, and trucked offsite inside a one-week window tied to the furniture teardown.

OUR SOLUTION

Three floors. One week. Trucks loaded on schedule.

01

Disconnected floor by floor

Crews worked each floor in sequence, disconnecting every PC, monitor, TV, projector, and rack so the furniture teardown could follow without delay.

02

Staged into designated rooms

Two-day action plan,
scoped down to materials

Equipment moved from each floor to designated staging rooms, then down to the garage staging area and packed into gaylords ready for transport.

03

Loaded and trucked offsite

Trucked every gaylord offsite for downstream handling, with extended work hours and added staffing to keep the seven-day window.

04

Closed out on schedule

All three floors of IT assets — TVs, projectors, racks, and peripherals — removed inside the planned week alongside the furniture teardown.

Want results like these?

Want results like these?

Book a free walkthrough of your site or project.
We'll review scope, share what we'd do, and quote it transparently.

Book a free walkthrough of your site or project.
We'll review scope, share what we'd do, and quote it transparently.

Book a free walkthrough →